Dear Parents,
Over the past weeks we have been talking
about the Aboriginal people. We are now covering Aboriginal shelters. Part of
the coverage, I have assigned the class a group project.
There are 6 types of Shelter; students are
broken into groups of three to four. Each group is assigned type of a
shelter. Each group is to gather
information regarding the shelter they are assigned. They are also assigned to
draw and make a 3-D model of the shelter. We will take class time to work on
it. Next week, we will be in the science lab to start the 3-D model. I have
handed out the rubric that will be used during their presentation on the week
of January 21, 2012.
The due date for the project is due Monday, January 21, 201
The
presentation dates are as follow
1. Monday, January 21, 201
2. Wednesday, January 23,
2013
A random selection was done for the order
of the presentation. The groups know
when they will be presenting.
Thank you,
Tr. Merve